Monday, January 3, 2011

From 2011 Bus Transjakarta using GPS

Tracking or tracking system that will bebe appliedon bus Transjakarta 2011 . If already running, it is believed the net mass transport in the capital will be increasingly integrated.

Jakarta Transportation Agency head Udar Pristono justify tracking system on the busway be realized with the installation of Global Positioning System (GPS). "The bus mounted the GPS to be able to know the distance," said pris.

This system is believed to function to reduce passenger congestion at the stop-busway station. Establishments expect the application of this system can increase or distance headway between buses.

"In 2011 the system was established, and the monitoring center in Jakarta Affair," he said, Saturday, January 1, 2011.

Jakarta Governor Fauzi Bowo hoping tracking system will be used to improve the quality and comfort of the passengers on the busway.

"Operations will be equipped with control systems and tracking of the busway system. Headway and needs can be controlled," he said.

Operations Manager of the Public Service Board, Gunarjo, said, still needs improvement as a whole to increase the headway or distance between the bus.

"It depends on the readiness of BBG, had awakened her SPBG yet. Sterilization rotation needs to be addressed. If you want maximum, must be addressed thoroughly," he said.

Settling TransJakarta management will also be conducted. Transjakarta Public Service Board will change into the Regional-Owned Enterprises (enterprises), and separated from the Jakarta Transportation Agency.

In the future busway fare no longer be subsidized after-managed financial system. During this operation a lot rests on the budget TransJakarta Establishments.

Assistant Secretary for Economic Establishments, Hasan Basri said, the review status of this TransJakarta has been going on for six months.

During the design of the transfer, the TransJakarta will still impose the same thing, namely the old rates still apply.

0 comments:

Post a Comment